OpenStreetMap logo OpenStreetMap

Changeset When Comment
121581761 over 3 years ago

The station entrance is opened but the rest of the building is still fenced off (including the Oxford St side) as construction seems unfinished above the station entrance.

120063281 over 3 years ago

Hi. I've removed what I'm sure would have been errant extra tagging with 'node=2133959589' from 4 areas of grass (in changeset/120430257).

119690188 over 3 years ago

Hi. The errant tagging has now been removed.

114405086 over 3 years ago

Thanks for pointing this out, Daniel.

I've now fixed the error gap here.

Regards,
Mac

118722346 over 3 years ago

Hi. I've changed Vallentin Road to oneway=no.

The road has new a 'no entry' restriction at its west end (buses + cycles are exempted). This is already set as a pair of turn restrictions.

General motorists can still enter at the east end of the road, travel westwards almost to the end of the road and then do a u-turn and exit the same way they entered.

118590501 over 3 years ago

Hi. I've corrected the turn restriction relation/13933331 into 2 separate 'no left' + 'no straight ahead' turn restrictions (except cycles).

87951032 almost 4 years ago

I can see that you've now resolved this issue.

118408630 almost 4 years ago

Thanks. These are all now removed.

116566030 almost 4 years ago

Hi,

"crossing=toucan" is not an approved tag for a crossing with traffic signals. See crossing=*?uselang=en-GB#Approved_tags

"toucan" is only valid as a value for "crossing_ref". See crossing_ref=*

115857452 almost 4 years ago

Since changeset/115290764 the extent of the relation for "EV1 in Spain" also included the Ireland section of the EV1 route.

This was due to a circular reference within the relation/2763798 parent relation, with this relation wrongly being included as a submember of one of its child subrelation (Spain's EV1 superrelation).

115682030 almost 4 years ago

There's definitely been a realignment of relation/11815403.

The cycleway is fully constructed, but is just not officially accessible yet.

115682030 almost 4 years ago

Hi. I think it's a bit premature to consider this barriered cycleway as being officially open. See https://853.london/2021/10/01/deptford-creek-roads-4-2m-cycleway-4-will-not-open-until-at-least-march-council-admits/

If you disregard the barriers, when cycling westbound the 'route' comes to a particularly unsafe cul de sac, with no cycling crossing.

Eastbound is a lot less unsafe, but the (functional) cycle lights for crossing node/6552004400 are kept covered up. Also, I doubt anyone is daring to use (or even move the barriers at) way/697668255 - I think the planned cycle lights might not even work here.

In terms of previously existing cycle routes, the only two-way route that could really be made safely would be the NCN21-NCN4 link to the east of node/6552004401. The unstarted work that is holding up the opening of the cycleway is along this section though.

Regards,
Mac

106429713 almost 4 years ago

Hi. This now now been moved back.

113876596 about 4 years ago

Yep. I'd sent you a private message mentioning this. You had also mapped the 2 links here as a single (i.e. 'continuous') route which isn't the case.

113535470 about 4 years ago

Agree. I've changed this to a cycleway now. I didn't notice any dropped kerb on the QEOP side to merit tagging as a cycleway at that end though.

There is some work going on at way/850658623 which is currently closed. Possibly the steps there are being converted to a ramp, but I didn't survey the work.

113165840 about 4 years ago

Ah, I see. Interestingly https://www.whatdotheyknow.com/en/request/breakdown_of_100km_of_cycle_lane does list 0.5 km of Loughborough Road as 'New or upgraded cycle routes delivered or are under Route length construction'.

Also, https://moderngov.lambeth.gov.uk/documents/s117177/Appendix%201%20Covid-19%20Transport%20Strategy%20Programme.pdf#page=8 projected just 2 weeks of work in 2020 for whatever was planned here.

I'll re-tag this with state=proposed.

113178713 about 4 years ago

Here's a map of the London Cycle Network as it was in 2004: https://web.archive.org/web/20040529124642/http://www.londoncyclenetwork.org.uk/uploaded_files/library/documents/LCN_MAP_2004.pdf

The relation (13400058) for this LCN route can be viewed at https://cycling.waymarkedtrails.org/#route?id=13400058 and is tagged with "cycle_network=GB:London Cycle Network".

Signage along the route is a mixture of council signage (which includes segment/links that are not part of the National Cycle Network) and Sustrans' NCN stickers. Along London's NCN4, it is a local network route, a national network route and an international (EV2) network route... but signage-wise all three are represented by the same 'ref=4'. As far as I'm aware, there is no actual signage for EV2 in the UK.

113178713 about 4 years ago

Within London, Route 4 of the National Cycle Network is also Route 4 of the London Cycle Network. A separate subrelation was needed to represent the section that is part of the LCN, and this includes a segment in Putney that has been dropped from the NCN.

112762505 about 4 years ago

Ah, I see. I've reverted my changes to the roundabout now, including the central grass circle.

Have a look at way/962036167. I've retagged this central grass island as 'was:landuse=grass' cos it already was overlapping some of the roadway prior to my changeset + so it will need redrawing too. Maybe you'd be able to have a go at this.

112285798 about 4 years ago

I'd interpret the wiki as referring to whether to map physically separate cycleways (e.g. way/156111836 on this stretch of road) as a simple 'highway=* + cycleway=track' or to map as a separate 'highway=cycleway'. I'd always aim to map these as separate ways.