OpenStreetMap logo OpenStreetMap

Changeset When Comment
165030070 19 days ago

I'll have a look again in a few days. Would definitely be better if the signed route from Canning Town did bypass those lights.

I did check out the Dock Rd diversion route yesterday. Still a few bits I'm not fully clear about, but there shouldn't be too much to tweak with on OSM when the viaduct works begin takes effect.

147262243 27 days ago

I have done.

147262243 27 days ago

I've done some further edits on Hammersmith Rd and removed the "disused:" prefix for the ref.

I'm not completely sure if the temporary pedestrian ramps have been removed, so I've left them in place.

164936269 about 1 month ago

Source is the NTA's published CycleConnects map for Kilkenny, available at https://consult.nationaltransport.ie/sites/default/files/CycleConnects%20-%20Kilkenny%20Urban%20Cycle%20Network.pdf

There's no indication that the cycle network being delivered nationally (including the National Cycle Network) will ever be actual signed routes.

164551835 about 1 month ago

It might need updated satellite imagery to get this all accurate, but I get the felling you might have realigned it a bit now.

I have extended the temporary oneway on Dock Rd a little further south after passing there today.

Near the Cycle Shuttle bus stop, I suspect
osm.org/way/893713893 might be the intended shared use path for the new cycle route. At the moment it's just all very under-signed with the shared paths (and speed limits too) , but hopefully some more signs will come here.

164551835 about 2 months ago

I've an inkling that Dock Rd might open at some point tomorrow.

164551835 about 2 months ago

Should the traffic signals now be removed from osm.org/node/1683288283?

164465083 about 2 months ago

I spotted it yesterday. Possibly will still get a few more adjustments between here and the roundabout before Monday.

143339525 about 2 months ago

I passed there today. Still closed. Could be at least a few more months before it could open.

164058291 about 2 months ago

Thanks. Was a partially deleted source=" tag.

Now fully deleted.

162289487 3 months ago

Regular problem with ID unfortunately.

161292238 4 months ago

Would be very tricky to get the right order using ID!

I discovered osm.wiki/Relatify yesterday. It could be particularly useful for mapping new bus route relations although I didn't test it too much.

160127229 5 months ago

Hi, as it appears that cyclists entering the circular junction don't have to give way to cyclists who are already on the junction, the junction=roundabout tag isn't correct.

junction=circular could be used instead.

I have readded the is_sidepath* tags, although I've also changed this tagging from the (former) tertiary to secondary.

157316645 8 months ago

A lot of geometries will have to be estimates.

I've made a guess based on how it looks that they will use some of the new Dock Rd as part of a temporary access road into the back of the Expressway car park so that they can complete the works/kerbing on the NE side of the current dead end to Dock Rd.

155855417 9 months ago

I passed around there yesterday. Apart from the mid-section of Beaconsfield, almost all of the roads are constructed, and where relevant include oneway arrow markings and contraflow cycle logos.

They remain mostly unopened but they are well beyond being changeable. Alignments can always be adjusted later on using GPS or aerial imagery.

140566825 10 months ago

Well, there are no actual lanes (including cycle lanes) at these 2 crossing points.

154954364 10 months ago

It's not impossible that the temporary crossing on Manor Rd near Pond Rd could get relocated before the diversion begins.

Also I wouldn't be surprised if the advertised cycle route diversion changes to use the full length of Leywick St.

I'll be away when the diversion starts so if you're going to be surveying the diversion, OSM might need some adjustments to get things accurate.

I was told the ramp to the Greenway from Manor Rd is to get widened before the closure begins. I suspect its width won't actually change though. They have cleared the vegetation already which might be the 'widening', but it will be interesting to see if they do move the handrails further apart. (The steps nearby will remain open.)

154954364 10 months ago

The 18 month closure will be to the east of Canning Rd. This is the major work involved in this scheme.

The closure to the west of Canning Rd will only be for 2 or 3 months, possibly Dec 2024-Feb 2025.

144149679 10 months ago

Yeah, and the new signallised crossing on the northern arm is also for cyclists.

153300260 11 months ago

At this rate, Cycleway 2 might eventually get to Ilford by 2054!