Loading...
Way: Southeast Holgate Boulevard (603468150)
Version #4
Edited bicycle infrastructure per city database for the PeopleForBikes Bicycle Network Analysis #PFBBNAPortland
Tags
bicycle | designated |
---|---|
cycleway:both | lane |
cycleway:both:buffer | yes |
highway | secondary |
lanes | 3 |
lanes:backward | 1 |
lanes:both_ways | 1 |
lanes:forward | 1 |
maxspeed | 30 mph |
name | Southeast Holgate Boulevard |
sidewalk | both |
turn:lanes:both_ways | left |
Part of
2 relations
Nodes
4 nodes
- 5728706651 (part of way Southeast Holgate Boulevard (603468149))
- 40585761 (part of way Southeast 105th Avenue (421151185))
- 4580510693 (part of way 462681202)
- 2005241442 (part of way Southeast Holgate Boulevard (189909407))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |