Loading...
Way History: Harbor Tunnel Thruway (455446647)
Version #5
Remove no sidewalk tagging from motorway; this is assumed
- Edited by ZeLonewolf
- Changeset #111739501
Tags
access_control | full |
---|---|
bicycle | no |
foot | no |
hgv | designated |
highway | motorway |
horse | no |
lanes | 2 |
maxspeed | 50 mph |
name | Harbor Tunnel Thruway |
note | Beginning November 2018 the northbound tube of 895 is closed for nearly three years of construction work. It is expected to reopen in Summer 2021. Until then, the southbound tube has been converted to two way operation. |
oneway | yes |
ref | I 895 |
source:access_control | MDSHA Highway Location Reference http://www.roads.maryland.gov/pages/hlr.aspx?PageId=832 |
toll | yes |
website | https://mdta.maryland.gov/I-895BridgeProject/Home.html |
Nodes
5 nodes
- 4518528641 (part of ways 455446648 and Harbor Tunnel Thruway (49800386))
- 258961975
- 258961976
- 258961924
- 49512013 (part of way Baltimore Harbor Tunnel (23891388))
Version #4
Removed the roads w650907865 and w650907861, added ‘oneway=yes’ tag for south direction Harbor Tunnel Thruway and removed a construction tag for north direction
- Edited by kmarkish_lyft
- Changeset #103176611
Tags
access_control | full |
---|---|
bicycle | no |
foot | no |
hgv | designated |
highway | motorway |
horse | no |
lanes | 2 |
maxspeed | 50 mph |
name | Harbor Tunnel Thruway |
note | Beginning November 2018 the northbound tube of 895 is closed for nearly three years of construction work. It is expected to reopen in Summer 2021. Until then, the southbound tube has been converted to two way operation. |
oneway | yes |
ref | I 895 |
sidewalk | none |
source:access_control | MDSHA Highway Location Reference http://www.roads.maryland.gov/pages/hlr.aspx?PageId=832 |
toll | yes |
website | https://mdta.maryland.gov/I-895BridgeProject/Home.html |
Nodes
5 nodes
- 4518528641 (part of ways 455446648 and Harbor Tunnel Thruway (49800386))
- 258961975
- 258961976
- 258961924
- 49512013 (part of way Baltimore Harbor Tunnel (23891388))
Version #3
895 construction closure ended
- Edited by ElliottPlack
- Changeset #84276970
Tags
access_control | full |
---|---|
bicycle | no |
construction | motorway |
foot | no |
hgv | designated |
highway | motorway |
horse | no |
lanes | 2 |
maxspeed | 50 mph |
name | Harbor Tunnel Thruway |
note | Beginning November 2018 the northbound tube of 895 is closed for nearly three years of construction work. It is expected to reopen in Summer 2021. Until then, the southbound tube has been converted to two way operation. |
oneway | yes |
ref | I 895 |
sidewalk | none |
source:access_control | MDSHA Highway Location Reference http://www.roads.maryland.gov/pages/hlr.aspx?PageId=832 |
toll | yes |
website | https://mdta.maryland.gov/I-895BridgeProject/Home.html |
Nodes
5 nodes
- 4518528641 (part of ways 455446648 and Harbor Tunnel Thruway (49800386))
- 258961975
- 258961976
- 258961924
- 49512013 (part of way Baltimore Harbor Tunnel (23891388))
Version #2
closed northbound 895 and updated southbound 895 to two-way for 2+ year construction project expected to be completed in 2021.
- Edited by ElliottPlack
- Changeset #65032819
Tags
access_control | full |
---|---|
bicycle | no |
construction | motorway |
foot | no |
hgv | designated |
highway | construction |
horse | no |
lanes | 2 |
maxspeed | 50 mph |
name | Harbor Tunnel Thruway |
note | Beginning November 2018 the northbound tube of 895 is closed for nearly three years of construction work. It is expected to reopen in Summer 2021. Until then, the southbound tube has been converted to two way operation. |
oneway | yes |
ref | I 895 |
sidewalk | none |
source:access_control | MDSHA Highway Location Reference http://www.roads.maryland.gov/pages/hlr.aspx?PageId=832 |
toll | yes |
website | https://mdta.maryland.gov/I-895BridgeProject/Home.html |
Nodes
5 nodes
- 4518528641 (part of ways 455446648 and Harbor Tunnel Thruway (49800386))
- 258961975
- 258961976
- 258961924
- 49512013 (part of way Baltimore Harbor Tunnel (23891388))
Version #1
Adding turn restrictions in Baltimore
Tags
access_control | full |
---|---|
bicycle | no |
foot | no |
hgv | designated |
highway | motorway |
horse | no |
lanes | 2 |
maxspeed | 50 mph |
name | Harbor Tunnel Thruway |
oneway | yes |
ref | I 895 |
sidewalk | none |
source:access_control | MDSHA Highway Location Reference http://www.roads.maryland.gov/pages/hlr.aspx?PageId=832 |
tiger:cfcc | A15:A16 |
tiger:county | Baltimore, MD:Baltimore-City, MD:Howard, MD |
tiger:name_base | I-895:I-95 |
tiger:name_base_1 | Harbor:Harbor Tunnel:I-895 |
tiger:name_base_2 | Harbor Tunnel |
tiger:name_type_1 | Thwy:Tunl |
tiger:name_type_2 | Thwy |
toll | yes |
Nodes
5 nodes
- 4518528641 (part of ways 455446648 and Harbor Tunnel Thruway (49800386))
- 258961975
- 258961976
- 258961924
- 49512013 (part of way Baltimore Harbor Tunnel (23891388))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |