Loading...
Way: 108778488
Version #9
Vorbereitung Neubau 2. teil der Brücke über den Südring
- Edited by Protoxenus
- Changeset #143202001
Tags
description | Gleise abgebaut wegen Neubau Brücke |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 40 |
operator | DB Netz AG |
razed:railway | rail |
service | siding |
voltage | 15000 |
workrules | DE:EBO |
Nodes
2 nodes
- 115 (1247180239) (part of ways 6325 (108778480) and 6325 (108778482))
- 1670470445 (part of ways 699671279, 1054370937, and 526445823)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |