Changeset When Comment
185548372

Thanks for the warm welcome! There might be some discrepancy because the footpath used to also double as a bikepath for a while during a construction in the area. The current (presumably stable) state is that from the railway crossing towards NW, the bikepaths merge into the road. (Im not sure if I marked everything fully correctly, because Im not too familiar with the OpenStreetMap UI, and was just using the StreetComplete app)