Changeset When Comment
192480244

this is why i don't like to overlap polygons with creeks because when someone is adjusting other things they break. this should fix the broken area issue

192479954

https://rivcodistrict3.org/sites/g/files/aldnop151/files/2024-03/Paubafactsheet.pdf

192338804

grand is going to be 6 lanes and eventually connect with mccall

191679074

https://tof.maps.arcgis.com/apps/instant/basic/index.html?appid=9c4e4e76c56242d88d8d7b52d27017ee

191268217

a small portion of romoland still exists after menifee incorporation annexed about 28 sq miles

190241239

not sure why i wait. to be honest. i normally wait like a week. ill update it right now

190241239

I normally split them. Wait and then go back to adjust the lane count

190241239

For lane count. In some sections there is turning lanes . Showed 2 lanes when there is 3.

182902689

the casino is gone. its being torn apart from the inside first. clark county approved it for a logistics center. terribles took over the casino in primm and sold this one

189479854

there was 2 ocean hills for the same neighborhood

189288865

hey, can you guys make sure your edits align with the buildings. some of the roads had overlap and most are now zig zag. alleys are not residential streets

189276425

the portion of markham from roosevelt to wood is going to be redone and paved according the county transit website

189229489

road widening from motte business center to the freeway

189152575

https://files.ceqanet.lci.ca.gov/303840-1/attachment/dkbHCsW01x4INlFFmzVA7lmMHP69Jp0lBig6r-LAnwP6C_-ooh7yye2whTnzWCR9tpNj-Vf50E-oogSc0

187372462

the roads in the indigo and tangerine development are not paved. its full of weeds its a stalled development

187156401

some of the streams were over houses

185994248

this area is zoned as residential trucking you you can live in your home and have your semi truck. i think the roofing guy was trying to do a node for his business

185994248

the roofing company is on orange. its behind the house at 18551 Orange St . not sure if the same house or flag poll lot

184609076

don't worry about it. the alignment for phase 2 isn't set in stone if i drew it over a housing tract. feel free to move it. its hard to get the final alignment from RCTC. i just wanted you to be aware about osm admins being weary of google references. phase 2 probably wont be constructed until after 2030 anyway. Ironically Phase 3 is going to be constructed first

185240752

they kept it as emergency access for now. guess people have to travel 2 miles to get gas. lol