de24000's Comments
| Changeset | When | Comment |
|---|---|---|
| 177855289 | Merhaba. Demiryolu saydings ve yard hat isim yazıyorsunuz. İsimler sadece ana hat için geçerlidir. |
|
| 175559191 | Freight? The tunnel mouth is at the same altitude as the YHT on the opposite bank. It appears to be about 20m to 30m above the conventional line. There is going to be a ramp as well on this junction... Let's wait and see what is going to be built exactly. |
|
| 175559191 | There is about 200m between the conventional line and the entrance to the tunnel towards Bursa. It is going to a R=200m curve at best. Unless you want everyone to spill their çay, it is going to be a low speed junction :) Also, traffic wise, most trains will proceed to the YHT line, not the conventional one. So it is most likely a single track junction, with no diamond crossing of the opposite track. Quite enough for 1 or 2 trains per day at low speed. I will change OSM accordingly if you are ok? |
|
| 175559191 | It does not make sense to add a double track junction to a single track line. The junction must be single track as well? |
|
| 155991587 | Dear mappinglander
|
|
| 172150400 | Hi
|
|
| 167656641 | Maybe there some construction, so I updated the tag accordingly for this way. In addition, way/1395533651 is showing a 360m tunnel. This is not verified by any other source, and it does not make sense in this context. Please check again? |
|
| 167656641 | Hi Erkinalp
|