RobertH-PUM's Comments
| Changeset | When | Comment |
|---|---|---|
| 156381162 | over 1 year ago | Is this new standard decided ? Because the format I'm using was used everywhere.
|
| 152158776 | over 1 year ago | Proiectul asta nu exista nicaieri. Se adauga pe harta proiecte propuse care au macar un studiu de fezabilitate realizat. |
| 149537145 | almost 2 years ago | Salut.
In rest, pentru cum adaugi mai multe detalii sa apara si pe harta API, consulta https://forum.peundemerg.ro/index.php?topic=836.0
|
| 149169454 | almost 2 years ago | Cand pui start_date pentru o constructie finalizata, trebuie sa stergi opening_date. |
| 146240088 | almost 2 years ago | There is no such thing as fully pedestrian in practice. Even in Piata Muzeului you can still enter with cars. Even in Piata Unirii you can still enter if you are an emergency or delivery.
|
| 146240253 | almost 2 years ago | Klein, Fortaretei can't be shared-space anymore in practice.
|
| 146238361 | almost 2 years ago | Does it allow access for residents, delivery and emergency vehicules? Yes It is exclusively for pedestrians? Yes. Then it's a pedestrian street. |
| 146238361 | almost 2 years ago | A highway=pedestrian is a road or an area mainly or exclusively for pedestrians in which some vehicle traffic may be authorized (e.g. emergency, taxi, delivery, ...). Here, the exact definition. It's a pedestrian street. |
| 146238209 | almost 2 years ago | Pedestrian zones can have access for residents and deliverys or emergency vehicules, you know?
|
| 146238209 | almost 2 years ago | Emilie Zola has a clear sign at the entry that tells it's a pedestrian zone. Pedestrian with private access for motor means it's a pedestrian zone with residents are allowed.
|
| 146238361 | almost 2 years ago | The streets are pedestrian first, residents and delivery are second. Living streets aludes to it being shared-space which is not.
|
| 134464178 | over 2 years ago | It's a way to separate a section of a highway that will be in tender and later on in construction.
|
| 137927576 | over 2 years ago | De ce trebuie sparta strada Oasului pe doua directii ca sa faci intersectia cu noul pod? In plus ai pus ca de pe pod te poti duce doar pe strada Oasului in directia garii (way/1185764320) ceea ce nu e corect. pentru ca poti si de pe sensul spre gara sa faci stanga sa intrii pe pod. |
| 134873369 | over 2 years ago | concrete base and the sitting is made of granite. |
| 126839383 | about 3 years ago | I will assume you are talking about A3-A8 junction. It's unknown how it will be. A3 towards Brasov was abandoned and isn't in any official plan up until 2030. |
| 130115455 | about 3 years ago | Teoretic se rezolva problema rutarii, practic tot vei avea persoane care vor incerca sa modifice capetele sau cum s-a mai intamplat cand umbla la giratii .
|
| 130115455 | about 3 years ago | Eu am inchis toata autostrada pentru ca altfel trebuie tinuta autostrada ca si construction dar tu ai pus ca e deja gata finalizata. |
| 130115455 | about 3 years ago | Te rog fi mai atent cand faci modificari.
|
| 128011028 | about 3 years ago | If this motorway is just planned and not in construction, then the tags need fixing. "construction=motorway" is wrong |
| 126707625 | over 3 years ago | There were plenty of times when a motorway in Romania was abandoned during construction with just gravel or even with the base made of dirt.
|