| 89930666 | Thanks for your interest. These cycle markings were added when what was formerly a gyratory was returned to two-way in order to raise driver awareness cyclists might be present. They don't create a route, just like SLOW markings don't create a slow travel route! Also LB Southwark (the highway authority) does not consider this as a route in any of its transport or other documents. When I get back from hols I will post something to talk-osm-gb as the question of what is a cycle route is often misunderstood in the UK in particular in London and is divergent from other countries. So your point is very much worth wider discussion. |
|
| 87638632 | Yes they should, sorry wasn't sure if changing the tag would do that or not. And didn't know how easily to change all the individual ways (at least for Phase 1 not 2A or 2B) to construction. There should be an updated dataset following Royal Assent (minor changes such as longer tunnel in a few places). I can request this if someone else can upload it to OSM. |