MacLondon's Comments
| Changeset | When | Comment |
|---|---|---|
| 150099379 | over 1 year ago | Good to know. I'll probably go to check on the Hoe St works in the next day or 2, so I'll go check on this crossing too. |
| 140348890 | over 1 year ago | Micromapping of the cycling infrastructure - best viewed on the CyclOSM layer. |
| 149496476 | over 1 year ago | Not sure whether you'd map route discs on bollards as guideposts... but I did spot one just south (I think) of node/11079475792. |
| 149496194 | over 1 year ago | I've added another guidepost (node/11781794485) to the Green Link Walk (approx location). I've seen another map show the route going the park at Clapton Square, but this guidepost would indicate that it doesn't. I've walked it via the park and it's very much not step-free at either side of the park. The route is billed as being step-free, so I'd be very confident that it doesn't go through the park but passes the guidepost instead. (Not step-free to cross the road at way/1078872732 either, but that does seem to be the signed route). |
| 148679674 | almost 2 years ago | This junction has been revised as part of the new Cycleway 4 route. Previous traffic islands were removed and the northbound roadway has been shifted. The dual carriageway now ends before this junction and doesn't exist on the tertiary road or to the SW of the junction. You've also readded an ASL that no longer exists and the cycle links from the tertiary road to Cycleway 4 are completely wrong too. Although your revision reflects the old layout, the previous mapping already reflected the new layout. I think it would be best to revert your changes here. Regards,
|
| 148679674 | almost 2 years ago | Hi. You seem to have restored this junction to how it was before its layout was changed in the last few months. |
| 123993521 | almost 2 years ago | None as far as I know. I know Westminster have hinted at some E-W route(s) via Mayfair and a route to Soho, but they don't seem to have specified how and whether previously indicated alignments have been changed. I wouldn't really expect Queen's Walk to be changed until there's a route developed between Mayfair and Green Park. It potentially might never happen (though full cycle network wasn't intended to be finished till 2041)... but they'd presumably develop an alternative parallel route further east if no route goes along Queen's Walk. |
| 148307671 | almost 2 years ago | I've removed those duplicated cycleways now. |
| 148307671 | almost 2 years ago | Hi, sorry for the delay in replying. I have tagged the cycling infrastructure accurately for the interim version of C4 and in compliance with cycleway=*. Cycle lanes (including wanded tracks) should be tagged on the main road, not as separate ways, even if they are two-way. I have also tagged these cycle lanes/tracks as being two-way. To map the on-road sections as separate ways misrepresents/exaggerates the infrastructure. Once fully rendered by CyclOSM, the new C4 section will appear accurately with thicker lines to show that the lanes are two-way. |
| 148117179 | almost 2 years ago | I've got most of it mapped now (guided by the footways and gojauntly maps, which do actually differ at some locations). There could be some minor inaccuracies on OSM but it should probably be good enough to follow (and correct where necessary.) I've left 2 gaps around Elephant & Castle where a ground survey would be needed to work out exactly where pedestrians are intended to cross the the road. |
| 147349932 | almost 2 years ago | Thanks for the update. |
| 147349932 | almost 2 years ago | Hi. There's a link to the document (from Wandsworth Council) at https://twitter.com/joncstone/status/1756586776896954567?t=6rgdoAaexzvnjMknSKqq_w&s=19 13 routes are set to be part of a single consultation which I believe is set to begin in the next week or 2. |
| 147392554 | almost 2 years ago | You can cross already, but the crossing on the south side of the bridge is to get revised in the coming months. There could still be significant future changes between the bridge and Connolly Station. |
| 143532113 | almost 2 years ago | changeset/145835759 would indicate that it did reopen. I've now removed the access=no tagging. |
| 146685455 | almost 2 years ago | Hi, I had a look at this last night but couldn't detect a duplicate node. I've been editing quite a bit around this estate, so I might have already in some way corrected this, but I'm not sure. |
| 145426361 | almost 2 years ago | The only lane markings on this section of road at the junction are the cycle lanes. |
| 145783204 | almost 2 years ago | Thanks. I did some more edits along here last night, and also at the recently removed roundabout. Your recent Mapillary imagery was invaluable. |
| 91164004 | almost 2 years ago | It is, yeah. I passed that way myself yesterday. Someone filmed a bus ride 4 days ago that shows the restriction/permission sign. See https://youtu.be/LXxl8GfVWUA?si=X7SWqBlxbksMGvQD&t=167 |
| 131001640 | about 2 years ago | I think you must have been referring to way/1122042226. The highway=footway tag was added in error. I have now removed the errant tag. |
| 131001640 | about 2 years ago | Which footway are you referring to? |