OpenStreetMap logo OpenStreetMap

Changeset When Comment
57508943 almost 7 years ago

Hello! Just wanted to let you know I'm updating the tagging on Ordessie Drive as it appears to still be under construction. I'm adding the highway=construction and construction=residential tags. I'm also expanding 'Dr.' to 'Drive' in the name as OSM prefers the expanded spelling of streets. Cheers!

42271527 almost 7 years ago

Hello! It looks like lane tags were added to Churchill Street located at 42.366583, -83.091421. However, Churchill street is a oneway up until shortly before it intersects with West Grand Boulevard. I have removed the lane=backward tag in favor of a oneway=yes tag as I believe it better represents the situation. Cheers, Andre

59548272 about 7 years ago

Hello! I noticed on Richards Lane the highway=residential tag was removed for a power=line tag. This appears to be in error as Richards Lane connects Old Country Road and Ellensue Drive. Can you provide any evidence that Richards Lane has been removed? I have returned the highway tag and removed the power tag. Thanks!

63323038 about 7 years ago

Great, I've raised your concern to the rest of the Microsoft team as well. Going forward our tags should reflect the specific Vicmap dataset. Thank you!

63323038 about 7 years ago

Hello,
I'm using the Vicmap Transport, CC-BY 4.0 , Department of Environment and Primary Industries, originally retrived from http://www.data.vic.gov.au/raw_data/vicmap-transport-scale-various/4840

Going forward, I can update my tags to 'source=Vicmap Transport:services.land.vic.gov.au' if you feel it to be more complete?

62292459 over 7 years ago

Frans S,

Apologies! I didn't intend to create a duplicate changeset. I am a recent hire for the Microsoft OSM team, and was tasked to the Indian Flood Area HOT task to familiarize myself with making simple edits.

When I selected the task from HOT Task Manager, it indicated there were previous editors in the area. However the task was not locked, nor was it submitted as complete for verification. Selecting the task showed a very large portion of the editable area was missing building polygons which was the goal of the task.

I figured it was acceptable to go in and finish mapping the buildings in the area as the task seemed incomplete. On that note, the Changeset you link seems to be a much smaller area than this one which likely explains why I thought the task was not yet finished.

Has my explanation made sense? I'd greatly appreciate any advice on how to avoid things like this in the future.

Thanks,
Andre T