Loading...
Way: 4950 (314109411)
Version #5
Adding railway maxspeed tags between Heilbronn and Schwäbisch Hall
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 110 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Part of
4 relations
- Relation KBS 783 Heilbronn - Crailsheim (146366) (as forward)
- Relation 4950 Crailsheim - Eppingen (190105)
- Relation Stadtbahn S4: Öhringen-Cappel => Albtalbahnhof (2395144)
- Relation S4: Öhringen => Schwaigern West (2400997)
Nodes
4 nodes
- Öhringen Hauptbahnhof (1166491202) (part of way 4950 (288230828))
- N2 (2920454622)
- 2289445318 (part of way 359372041)
- 3640977220 (part of way 4950 (863843435))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |