Loading...
Way History: 180689908
Version #13
mapped heritage details
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
railway:pzb | yes |
usage | main |
voltage | 15000 |
Nodes
Version #12
ETCS MNB Eberstadt
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
railway:pzb | yes |
usage | main |
voltage | 15000 |
Nodes
Version #11
ETCS RBC Eberstadt im Bau
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
usage | main |
voltage | 15000 |
Nodes
Version #10
Tagging of train protection systems in Germany (PZB systems at usage=main tracks)
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
usage | main |
voltage | 15000 |
Nodes
Version #9
railway details
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
Version #8
remodeled Bahnhof Darmstadt-Eberstadt after renovation
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
level | 1 |
maxspeed | 160 |
passenger_lines | 2 |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
Version #7
passenger-lines
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 160 |
passenger_lines | 2 |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
Version #6
RB 66 Darmstadt-Pfungstadt: fix PTv2 relation, fix railway errors along the track
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 160 |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
Version #5
railway details between HD and F via DA
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 160 |
railway | rail |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #4
Hauptbahn bei Darmstadt
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
railway | rail |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #3
railway fixing
Tags
bridge | yes |
---|---|
detail | track |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
railway | rail |
tracks | 1 |
voltage | 15000 |
Nodes
Version #2
small corrections
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
railway | rail |
tracks | 1 |
voltage | 15000 |
Nodes
Version #1
BBOX:8.39,48.99,13.60,54.48 ADD:8 UPD:4 DEL:0
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
railway | rail |
source:geometry | Bing aerial imagery |
voltage | 15000 |
Nodes
2 nodes
-
1911384020 - 889184897 (part of ways 654291468, 654291469, and 156569284)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |