Loading...
Way: 992590246
Version #1
US-98 Eastbound Lanes Base + Pave MS to Glenwood Road Construction(with portion of it 4 lanes)
- Edited by RollTideRoll_asdfjkll
- Changeset #112483677
Tags
construction | trunk |
---|---|
fut_ref | US 98 |
hgv | designated |
highway | construction |
lanes | 2 |
oneway | yes |
surface | asphalt |
toll | no |
Nodes
5 nodes
- 1240227038 (part of ways Industrial Parkway (108027686) and Industrial Parkway (108027603))
- 1240227203 (part of way Industrial Parkway (108027603))
-
1240227748 - 1240226958 (part of way Industrial Parkway (108027603))
- 1240227127 (part of way Industrial Parkway (108027603))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |