Way: 958318543
Version #2
Add recently-constructed sidewalks filling gaps in existing network along M 59/Hall Rd
Tags
footway | sidewalk |
---|---|
highway | footway |
lit | no |
note | Constructed in 2022/2023 with M 59 project. Not yet visible in imagery. Alignment is approximate |
surface | concrete |
width | 8'0" |