Loading...
Way: 953738997
Version #4
Hochspannungsinfrastruktur zwischen Lamspringe und Erzhausen
Tags
cables | 10 |
---|---|
circuits | 4 |
frequency | 50;16.7 |
operator | TenneT TSO GmbH |
power | line |
voltage | 380000;110000 |
wires | quad |
Part of
3 relations
- Relation 380-kV-Leitung Wahle-Mecklar Teilabschnitt B: UW Lamspringe – UW Hardegsen (12544977) (as line)
- Relation Kreiensen - Rethen 2 (151591)
- Relation Kreiensen - Rethen 1 (2328920)
Nodes
16 nodes
- B004 (5582281916) (part of ways Kreiensen - Rethen (1116886299) and 1017370651)
- B005 (5582281915)
- B006 (5582281914)
- B007 (5582281913)
- B008 (5582282822)
- B009 (5582281912)
- B010 (5582281911)
- B011 (5582281910)
- B012 (5582281909)
- B013 (5582281907)
- B014 (5582281906)
- B015 (5582281905)
- B016 (5582281903)
- B017 (5582281902)
- B018 (5582281904)
- B019 (5582281901) (part of ways Kreiensen - Rethen (1116886300) and 1116886301)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |