Loading...
Way: Airport Boulevard (932453851)
Version #1
Phase 1 extension to Church St is being developed. Construction in 2022. https://www.newsobserver.com/article250703514.html
Tags
Nodes
4 nodes
- 195419186 (part of ways Airport Boulevard (932453852), Airport Boulevard (750378314), and Chapel Hill Road (761154666))
- 7259047535
- 7026518186 (part of way H-Line (873121723))
- 195699954 (part of ways Church Street (162841669) and Airport Boulevard (106632349))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |