Loading...
Way: 926908520
Version #1
Speed limits, bridge area, guardrail, construction tag removal, and pavement type on US-80 from west of Bellamy to the I-20/59 interchange in Cuba.
- Edited by RollTideRoll_asdfjkll
- Changeset #102436113
Tags
Nodes
7 nodes
- 8600636554 (part of way 926908523)
- 8600636555 (part of way 926908527)
- 1840757903 (part of ways US 80 (173227405) and US 80 (173227415))
- 8600636556 (part of way 926908528)
- 8600636557 (part of way 926908524)
- 1840757904 (part of ways US 80 (173227408) and US 80 (173227405))
- 8600636554 (part of way 926908523)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |