Loading...
Way: Peninsula Subdivision MT1 (868469338)
Version #1
Partial updates on the 25th Avenue grade separation project. The relations and other minor thing still need to be fixed. I'm about to switch to JOSM to fix them.
Tags
electrified | no |
---|---|
fixme | The location of the southern part and its connection to the old track alignment is approximate. |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 8095106562 (part of way Caltrain Peninsula Subdivision (868469337))
- 8095106563
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |