Loading...
Way: 24.9km Bagram Road from Had Bakhshi Kabul to Had Bakhshi Qarabagh (784429126)
Version #3
#UNSGC #ETSU
- Edited by UNmapper_tpagnelli
- Changeset #82673465
Tags
carriageway_ref | 7 |
---|---|
condition | fair |
description | Construction of 2.4 Km Gravel Road and Drainage Structures fromFrom Main Road to Tara Khel Kabul Province.RRD/ DF/ NEEPRA/ KBL/ KBL/ 010 Constructed/Rehabilitation.by/NRAP/MRRD |
highway | tertiary |
lanes | 2 |
maxspeed | 40 |
name | 24.9km Bagram Road from Had Bakhshi Kabul to Had Bakhshi Qarabagh |
ref | V010220 |
source | NRAP/MRRD |
surface | asphalt |
width | 8 |
year_of_construction | 2007 |
Part of
Nodes
9 nodes
- 25943886 (part of ways 5.46 km Gravel Road From Main Road to Tara Khel (784632141) and 24.9km Bagram Road from Had Bakhshi Kabul to Had Bakhshi Qarabagh (784838984))
- 5643273956 (part of way 315850112)
- 25943893
- 5643273958
- 25943931
- 5643273959
- 25943933
- 25943934
- 25943937 (part of ways 24.9km Bagram Road from Had Bakhshi Kabul to Had Bakhshi Qarabagh (784508430) and 7982795)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |