Loading...
Way: Holloway Street (763475480)
Version #2
East End Connector project update: final alignment of eastbound US 70 open
Tags
alt_name | Wake Forest Highway |
---|---|
highway | primary |
lanes | 5 |
lanes:backward | 3 |
lanes:forward | 2 |
maxspeed | 35 mph |
name | Holloway Street |
oneway | no |
ref | US 70 Business;NC 98 |
sidewalk | both |
surface | asphalt |
turn:lanes:backward | left|through|right |
Part of
5 relations
- Relation GoDurham Route 3B The Village-Highway 98-Southern High School (9645296)
- Relation GoDurham Route 3C The Village-Highway 98-Rummel Street (9645295)
- Relation 98 (1573211)
- Relation 10592871 (as to)
- Relation 70 (1360165)
Nodes
2 nodes
- 7134112306 (part of ways 660705257 and Holloway Street (763475482))
- 7011174252 (part of ways 749768135 and Holloway Street (77591307))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |