Loading...
Way: 686418268
Version #1
Marked the Prum radweg bike path between Pronsfeld and Lunebach as "under construction". This part was destroyed in June 2018 by high water and needs to be rebuild: https://www.eifel.info/a-pruem-radweg
Tags
bicycle | designated |
---|---|
construction | path |
foot | designated |
highway | construction |
railway | abandoned |
segregated | no |
surface | asphalt |
Nodes
3 nodes
- 1835603813 (part of way 30450340)
- 2460629062
- 1835603846 (part of way 686418269)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |