Loading...
Way: DJ142L (685006749)
Version #33
update progress
- Edited by RobertH-PUM
- Changeset #122070229
Tags
bridge | yes |
---|---|
highway | secondary |
lanes | 2 |
layer | 1 |
ref | DJ142L |
smoothness | excellent |
start_date | 2021 |
status | AC,builder:Aktor+Euroconstruct,progress:98%/01.06.2022 89%/13.10.2021 88.78%/22.09.2021 78.10%/01.12.2020 61.50%/13.12.2019 48.99%/31.12.2018 44.00%/30.11.2017 15%/31.12.2016 9.28%/30.06.2016 |
surface | asphalt |
surface_survey | 2021NOV_RobertH@peundemerg.ro |
Part of
3 relations
- Relation A10 - Lot 2 (AlbaIulia-Aiud) (7391264)
- Relation DJ142L (8839583)
- Relation Valea Muresului (2841576)
Nodes
2 nodes
- 6418469871 (part of way DJ142L (979557509))
- 6418469872 (part of way DJ142L (685006750))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |