Loading...
Way: Peninsula Subdivision (655127949)
Version #9
Additional adjustments to railways and adjacent ways around Dridon Transit Center
Tags
electrified | no |
---|---|
gauge | 1435 |
level | 0 |
maxspeed | 15 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
railway:traffic_mode | freight |
usage | main |
Nodes
11 nodes
- 65477993 (part of ways Park Avenue Overpass (961446227) and Caltrain Peninsula Subdivision (28431979))
- 339429536 (part of way Caltrain Peninsula Subdivision (639288383))
- 8510379145
- 8510379146
- 8510379156
- 11088762219
- 6138389438
- 8510379163
- 8510379162
- 8510379161
- San Jose (3646391940) (part of way Caltrain Peninsula Subdivision (690829856))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |