Loading...
Way: 22 Stycznia (626893408)
Version #8
Od 3 listopada 2022r. drogi będą zamknięte z powodu budowy nowego mostu kolejowego. ANG : From November 3, 2022. roads will be closed due to the construction of a new railway bridge.
Tags
access | no |
---|---|
highway | unclassified |
lit | yes |
maxspeed | 40 |
maxweight | 2.2 |
name | 22 Stycznia |
sidewalk | separate |
surface | asphalt |
Nodes
6 nodes
- 560182803 (part of ways 22 Stycznia (626893409) and Klasztorna (44095952))
- 1777940197
- 560182873
- 3412605329 (part of way 22 Stycznia (1135958346))
- 9098853258 (part of ways 22 Stycznia (1135958346) and 984050997)
- 560182872 (part of ways Romualda Traugutta (44095951), 22 Stycznia (984040741), and 22 Stycznia (1135958346))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |