Loading...
Way: 5620 (570465891)
Version #5
Die Hauptbahn Holzkirchen-Schliersee soll elektrifiziert werden
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 100 |
operator | DB Netz AG |
passenger_lines | 1 |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:pzb | yes |
ref | 5620 |
usage | main |
Nodes
13 nodes
- 944293735 (part of way 5620 (570465895))
- 301222432
- 1470722480
- 30089894
- 301222435
- 944293732
- 30089893
- 30089892
- 30089657
- 30089656
- 30089655
- 30089467
- 3600788698 (part of way 5620 (354342243))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |