status | AC,builder:Pizzarotti,progress:93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
surface_survey | 2020DEC_RobertH@peundemerg.ro |
Nodes
11 nodes
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
Version #32
Awaits opening
- Edited by RobertH-PUM
- Changeset #95115154
Tags
access | no |
---|---|
highway | trunk |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
ref | DNCALB |
smoothness | excellent |
start_date | 2020 |
status | AC,builder:Pizzarotti,progress:93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
surface_survey | 2020DEC_RobertH@peundemerg.ro |
Nodes
11 nodes
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
Version #31
Awaits opening
- Edited by RobertH-PUM
- Changeset #95115126
Tags
access | no |
---|---|
highway | trunk |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | DNCALB |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
surface_survey | 2020DEC_RobertH@peundemerg.ro |
Nodes
11 nodes
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
Version #30
update status
- Edited by RobertH-PUM
- Changeset #95061958
Tags
construction | trunk |
---|---|
highway | construction |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | DNCALB |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
11 nodes
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
Version #29
corrected
- Edited by RobertH-PUM
- Changeset #94986408
Tags
construction | trunk |
---|---|
highway | construction |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | DNCALB |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.60%/06.11.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
11 nodes
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
Version #28
corrected
- Edited by RobertH-PUM
- Changeset #94905430
Tags
construction | trunk |
---|---|
highway | construction |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | DNCALB |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.60%/06.11.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
21 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
- 8170955660 (part of way DNCALB (878911165))
- 8170955661 (part of way DNCALB (878911165))
- 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
- 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #27
corrected
- Edited by RobertH-PUM
- Changeset #94905182
Tags
construction | trunk |
---|---|
highway | construction |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | DNCALB |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.60%/06.11.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
21 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
- 8170939569 (part of ways 878258281 and DNCALB (878911165))
-
8170939571 -
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 8170939572 (part of ways Centura Alba Iulia (880729141) and DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
- 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #26
Update A10 lot 1 progress based on CNAIR reports
- Edited by rpristopan
- Changeset #93681714
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2021 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.60%/06.11.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #25
Update A10 lot 1 progress based on CNAIR reports
- Edited by rpristopan
- Changeset #92429144
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2021 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.50%13.10.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #24
Below 10% chance of Lot 1 to be open this year
- Edited by RobertH-PUM
- Changeset #90800338
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2021 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #23
Update A10 Sebes - Turda lot 1 progress based on CNADNR reports
- Edited by rpristopan
- Changeset #90355898
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #22
Update A10 lot 1 Sebes - Turda progress based on CNADNR reports
- Edited by rpristopan
- Changeset #88515645
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:89.50%/20.07.2020 89.10%/01.07.2020 88.50%/01.06.2020 86.00%/01.05.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #21
update open date.
- Edited by RobertH-PUM
- Changeset #87787067
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:89.10%/01.07.2020 88.50%/01.06.2020 86.00%/01.05.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #20
Update A10 lot 1 Sebes - Turda progress based on CNADNR reports
- Edited by rpristopan
- Changeset #87604307
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:89.10%/01.07.2020 88.50%/01.06.2020 86.00%/01.05.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #19
Update A10 Sebes - Turda, lot 1 progress based on CNADNR reports
- Edited by rpristopan
- Changeset #86519043
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:88.50%/01.06.2020 86.00%/01.05.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #18
update status
- Edited by RobertH-PUM
- Changeset #85043024
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:86.00%/01.05.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #17
update status
- Edited by RobertH-PUM
- Changeset #83530311
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:84.60%/01.04.2020 82.00%/13.12.2019 80.50%/11.11.2019 77.90%/16.10.2019 63.90%/21.03.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #16
Update progress
- Edited by RobertH-PUM
- Changeset #78387811
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:82.00%/13.12.2019 80.50%/11.11.2019 77.90%/16.10.2019 63.90%/21.03.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #15
Update progress
- Edited by RobertH-PUM
- Changeset #76918581
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:80.50%/11.11.2019 77.90%/16.10.2019 63.90%/21.03.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #14
Status update
- Edited by RobertH-PUM
- Changeset #75784000
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:77.90%/16.10.2019 75%/09.09.2019 73.50%/03.08.2019 71.30%/07.07.2019 69.80%/12.06.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #13
Update status
- Edited by RobertH-PUM
- Changeset #74266813
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:75%/09.09.2019 73.50%/03.08.2019 71.30%/07.07.2019 69.80%/12.06.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #12
Update status
- Edited by RobertH-PUM
- Changeset #72973575
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:73.50%/03.08.2019 71.30%/07.07.2019 69.80%/12.06.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #11
Status update
- Edited by RobertH-PUM
- Changeset #71981368
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:71.30%/07.07.2019 69.80%/12.06.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #10
Update status
- Edited by RobertH-PUM
- Changeset #71186440
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:69.80%/12.06.2019 67.10%/19.04.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #9
Status update
- Edited by RobertH-PUM
- Changeset #69387247
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:67.10%/19.04.2019 63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #8
Corrected ways direction
- Edited by RobertH-PUM
- Changeset #68753985
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #7
Added new name
- Edited by RobertH-PUM
- Changeset #68738236
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | ST1: Alba Iulia sud Interchange |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #6
Update progress
- Edited by RobertH-PUM
- Changeset #68377093
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2020 |
ref | A10 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:63.90%/21.03.2019 60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #5
Update status
- Edited by RobertH-PUM
- Changeset #67255191
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2020 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #4
Actualizare progres ST1 si data de deschidere
- Edited by RobertH-PUM
- Changeset #66129364
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2020 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:60%/31.12.2018 50.50%/01.08.2018 39.50%/30.11.2017 20%/30.06.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.8%/30.09.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #3
motorways opening years adjusted
- Edited by cristianbogdan
- Changeset #55061434
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2019 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:39.50%/30.11.2017 20%/30.06.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.8%/30.09.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #2
Status Update
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2018 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:39.50%/30.11.2017 20%/30.06.2017 17.42%/30.03.2017 16.2%/31.12.2016 12.8%/30.09.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Version #1
A10 - Completari
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
name | A 10 Sebeș–Turda: Alba Iulia Interchange |
opening_date | 2018 |
smoothness | excellent |
status | AM,builder:Pizzarotti |
surface | asphalt |
Nodes
20 nodes
- 5256408456 (part of way DNCALB (878911165))
- 5256408457 (part of ways Centura Alba Iulia (880729138) and DNCALB (878911165))
- 5256408458 (part of way DNCALB (878911165))
- 5256408459 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729139))
- 5256408460 (part of way DNCALB (878911165))
-
5256408442 - 5256408443 (part of ways 878258280 and DNCALB (878911165))
- 5256408444 (part of way DNCALB (878911165))
- 5256408445 (part of way DNCALB (878911165))
- 5256408451 (part of ways DNCALB (878911165) and DNCALB (878911165))
-
5256408452 -
5256408453 - 5256408454 (part of ways DNCALB (878911165) and Centura Alba Iulia (880729140))
- 5256408455 (part of way DNCALB (878911165))
- 5256408446 (part of way DNCALB (878911165))
- 5256408447 (part of way DNCALB (878911165))
- 5256408448 (part of way DNCALB (878911165))
- 5256408449 (part of way DNCALB (878911165))
- 5256408450 (part of way DNCALB (878911165))
- 5256408456 (part of way DNCALB (878911165))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |