Loading...
Way: 50956050
Version #12
railway centering
- Edited by Marc Mongenet
- Changeset #144137774
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | SBB |
passenger_lines | 1 |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
usage | branch |
voltage | 15000 |
Part of
5 relations
- Relation S3: Luzern → Brunnen (88438)
- Relation 532 (2647973)
- Relation IR VAE: St. Gallen → Luzern (1363294)
- Relation IR VAE: Luzern → St. Gallen (3531823)
- Relation S3: Brunnen → Luzern (10724333)
Nodes
18 nodes
- 649779054 (part of ways 33265979, 396669324, and 1234133311)
- 1417759046
- 11358112052
- 1014218050
- 1014204533
- 11358112053
- 1014205344
- 651645395
- 11358112054
- 1014206528
- 651645394
- 11358112055
- 2052632556
- 1014207005
- 651645396
- 1014204996
- 11358112056
- 255135198 (part of ways 1158050161 and 135207288)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |