Loading...
Way: 451517311
Version #1
[DasmariƱas, Cavite] add line reference to 230 kV line, expand substation switchgear on NGCP DasmariƱas Substation (additional transformers, switchgear, and lines) add new Meralco sub-transmission line, realign roads and retag part of Aguinaldo Highway
- Edited by TagaSanPedroAko
- Changeset #43416749
Tags
cables | 3 |
---|---|
frequency | 60 |
operator | National Grid Corporation of the Philippines |
power | line |
voltage | 230000 |
Nodes
7 nodes
- 4393755228 (part of ways 441650821 and 447849477)
- 4483451170 (part of way 441650835)
- 4483451159
- 4483451161
- 4483451175
- 4483451167 (part of way 441650860)
- 4483451164 (part of way 441650852)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |