Loading...
Way History: Wendy Bagwell Parkway (386385786)
Version #5
Functional class changes
Tags
HFCS | Principal Arterial - Other |
---|---|
NHS | yes |
bicycle | yes |
foot | yes |
hgv | designated |
hgv:national_network | yes |
highway | trunk |
lanes | 2 |
maxspeed | 55 mph |
name | Wendy Bagwell Parkway |
oneway | yes |
ref | US 278;GA 6 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
source:maxspeed | survey 2014-06-14 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Paulding, GA |
tiger:name_base | Wendy Bagwell |
tiger:name_base_1 | State Route 6 |
tiger:name_base_2 | United States Highway 278 |
tiger:name_type | Pky |
tiger:reviewed | no |
Nodes
2 nodes
- 3897042838 (part of way Wendy Bagwell Parkway (628395598))
- 4163756808 (part of way Wendy Bagwell Parkway (415333295))
Version #4
trunk fixes wip
- Edited by floridaeditor
- Changeset #87981669
Tags
HFCS | Principal Arterial - Other |
---|---|
NHS | yes |
bicycle | yes |
foot | yes |
hgv | designated |
hgv:national_network | yes |
highway | primary |
lanes | 2 |
maxspeed | 55 mph |
name | Wendy Bagwell Parkway |
oneway | yes |
ref | US 278;GA 6 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
source:maxspeed | survey 2014-06-14 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Paulding, GA |
tiger:name_base | Wendy Bagwell |
tiger:name_base_1 | State Route 6 |
tiger:name_base_2 | United States Highway 278 |
tiger:name_type | Pky |
tiger:reviewed | no |
Nodes
2 nodes
- 3897042838 (part of way Wendy Bagwell Parkway (628395598))
- 4163756808 (part of way Wendy Bagwell Parkway (415333295))
Version #3
corrected ref information
- Edited by ionutr_telenav
- Changeset #62661654
Tags
HFCS | Principal Arterial - Other |
---|---|
NHS | yes |
bicycle | yes |
foot | yes |
hgv | designated |
hgv:national_network | yes |
highway | trunk |
lanes | 2 |
maxspeed | 55 mph |
name | Wendy Bagwell Parkway |
oneway | yes |
ref | US 278;GA 6 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
source:maxspeed | survey 2014-06-14 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Paulding, GA |
tiger:name_base | Wendy Bagwell |
tiger:name_base_1 | State Route 6 |
tiger:name_base_2 | United States Highway 278 |
tiger:name_type | Pky |
tiger:reviewed | no |
Nodes
2 nodes
- 3897042838 (part of way Wendy Bagwell Parkway (628395598))
- 4163756808 (part of way Wendy Bagwell Parkway (415333295))
Version #2
adding buildings; adding service roads; adding turn lanes
- Edited by Jack the Ripper
- Changeset #39074232
Tags
HFCS | Principal Arterial - Other |
---|---|
NHS | yes |
bicycle | yes |
foot | yes |
hgv | designated |
hgv:national_network | yes |
highway | trunk |
lanes | 2 |
maxspeed | 55 mph |
name | Wendy Bagwell Parkway |
oneway | yes |
ref | US 278; GA 6 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
source:maxspeed | survey 2014-06-14 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Paulding, GA |
tiger:name_base | Wendy Bagwell |
tiger:name_base_1 | State Route 6 |
tiger:name_base_2 | United States Highway 278 |
tiger:name_type | Pky |
tiger:reviewed | no |
Nodes
2 nodes
- 3897042838 (part of way Wendy Bagwell Parkway (628395598))
- 4163756808 (part of way Wendy Bagwell Parkway (415333295))
Version #1
adding maxspeeds; improving road alignment; adding buildings
- Edited by Jack the Ripper
- Changeset #36015742
Tags
HFCS | Principal Arterial - Other |
---|---|
NHS | yes |
bicycle | yes |
foot | yes |
hgv | designated |
hgv:national_network | yes |
highway | trunk |
lanes | 2 |
maxspeed | 55 mph |
name | Wendy Bagwell Parkway |
oneway | yes |
ref | US 278; GA 6 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
source:maxspeed | survey 2014-06-14 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Paulding, GA |
tiger:name_base | Wendy Bagwell |
tiger:name_base_1 | State Route 6 |
tiger:name_base_2 | United States Highway 278 |
tiger:name_type | Pky |
tiger:reviewed | no |
Nodes
3 nodes
- 3897042838 (part of way Wendy Bagwell Parkway (628395598))
- 71898352 (part of ways Isley Stamper Road (9425269), Wendy Bagwell Parkway (415333296), and Wendy Bagwell Parkway (415333295))
- 72005761 (part of ways C H James Parkway (9123908) and Wendy Bagwell Parkway (415333296))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |