Loading...
Way: 332941116
Version #4
Adding railway line speed limits and usage tags in Italy (maximum allowable speed between two stations)
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
maxspeed | 110 |
railway | rail |
usage | main |
voltage | 1500 |
Nodes
6 nodes
- 3077102644 (part of ways 1164954069, Genova – Ventimiglia (1238152585), and Genova – Ventimiglia (745044858))
- 1509096674 (part of ways 1164954071 and Genova – Ventimiglia (1238152585))
- 1509096716
- 1509096743
-
1509096763 - Ventimiglia (1509096850) (part of way Ferrovia Marsiglia-Ventimiglia (545768682))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |