Loading...
Way: Wade Hampton Boulevard (316664515)
Version #5
correct highway geometry #telenav
- Edited by anap_telenav
- Changeset #130140717
Tags
NHS | yes |
---|---|
highway | primary |
lanes | 7 |
lanes:backward | 4 |
lanes:forward | 3 |
maxspeed | 45 mph |
name | Wade Hampton Boulevard |
ref | US 29 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Greenville, SC |
tiger:name_base | Wade Hampton |
tiger:name_base_1 | United States Highway 29 |
tiger:name_type | Blvd |
turn:lanes:backward | left||| |
Part of
4 relations
- Relation 11K outbound (2294798) (as forward)
- Relation 11K inbound (2294797) (as backward)
- Relation 29 (2302695)
- Relation Wade Hampton (12601579)
Nodes
5 nodes
- 112918135 (part of ways West Lee Road (316664512), Cherokee Drive (12408202), and Wade Hampton Boulevard (1122560924))
- 7011373724 (part of way 749792976)
- 7226994692 (part of way 774597923)
- 7011373729 (part of way 749792979)
- 3228063981 (part of way Wade Hampton Boulevard (529990782))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |