Way History: Neckar-Alb-Bahn (316249425)
Version #10
mapped tunnel details
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 4 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
4 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 4395227784
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #9
Wikidata-Kennungen importiert
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 4 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikidata | Q1608537 |
wikipedia | de:Bahnstrecke Plochingen–Immendingen |
Nodes
4 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 4395227784
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #8
Bahnstrecke 4600 zwischen Tübingen und Plochingen: Bahnkilometer ergänzt
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 4 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
4 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 4395227784
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #7
Eisenbahn-Relationen: Strecken:
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 4 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
4 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 4395227784
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #6
passenger-lines
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 4 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #5
Bahnanlagen-Details zwischen Metzingen und Plochingen
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf7 "11") beim Streckenkilometer 8 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #4
Bahnanlagen- und weitere Details zwischen Kirchheim (Teck) und Plochingen
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
- 2522105683
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
Version #3
Pauschale Geschwindigkeitsangabe für die Neckar-Alb-Bahn herausgenommen
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
- 2522105683
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
Version #2
fix wikipedia links
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 130 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
priority | primary |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
- 2522105683
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
Version #1
Stationen den Routenrelationen S 1 auf PTv2 umgestellt. S1 fährt in Kirchheim (Teck) von Gleis 2. name -> railway:track_ref in Esslingen. Fahrwegkorrektur S 1 Richtung Kirchheim (Teck) in Böblingen
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 130 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
priority | primary |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1859 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 3 (1308892129) (part of ways Teckbahn (115969693) and Neckar-Alb-Bahn (30929490))
- 2522105683
- W2 HV (1308892128) (part of ways 115969688 and Neckar-Alb-Bahn (124949007))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |