Loading...
Way: 283872536
Version #48
update status
- Edited by RobertH-PUM
- Changeset #111545610
Tags
destination | Borș;Cluj-Napoca;Turda;Câmpia Turzii |
---|---|
destination:ref | A10 |
highway | motorway_link |
lanes | 2 |
maxspeed | 80 |
oneway | yes |
smoothness | excellent |
start_date | 2021 |
status | AC,builder:Pizzarotti,progress:98%/22.09.2021 97.01%/10.08.2021 93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
surface_survey | 2021JUL_RobertH@peundemerg.ro |
Nodes
6 nodes
- 2876858324 (part of way 342056180)
- 6566526303
- 2525415462
- 8772568970
- 8772568969
- 2525415421 (part of ways 252837222 and 880729144)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |