Way History: Riesbahn (28354724)
Version #15
Aufhausen (Württ) Haltepunkt: Bahnsteig als Fläche erweitert und ausgerichtet, Fahrradanlage und Parkplatz ergänzt
- Edited by NVBW_Seifert
- Changeset #147920087
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 90 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
passenger_lines | 1 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
source:maxspeed | Geschwindigkeitssignal (Lf 7 "9") vor dem Nordwestportal des Bildwasentunnels |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
18 nodes
- 430932815 (part of way Riesbahn (37053412))
- 3396839286 (part of way Tierstein mit Hangwald und Egerquelle (332537143))
- 568723289
- 309848638
- 430932808
- 7050454120
- 568723291
- 311410416
- 311410417
- 311348446
- 1502266303
- 568723293
- 1502266307
- 309848639
- 2720031275
- 11664654975
- 430932805
- 430932807 (part of way Riesbahn (37053396))
Version #14
#maproulette adding layer tag
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 90 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
passenger_lines | 1 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
source:maxspeed | Geschwindigkeitssignal (Lf 7 "9") vor dem Nordwestportal des Bildwasentunnels |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
17 nodes
- 430932815 (part of way Riesbahn (37053412))
- 3396839286 (part of way Tierstein mit Hangwald und Egerquelle (332537143))
- 568723289
- 309848638
- 430932808
- 7050454120
- 568723291
- 311410416
- 311410417
- 311348446
- 1502266303
- 568723293
- 1502266307
- 309848639
- 2720031275
- 430932805
- 430932807 (part of way Riesbahn (37053396))
Version #13
Ergänzungen an der Riesbahn (Teil 1)
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 90 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
passenger_lines | 1 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
source:maxspeed | Geschwindigkeitssignal (Lf 7 "9") vor dem Nordwestportal des Bildwasentunnels |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
Version #12
Passenger-lines added
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
passenger_lines | 1 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
Version #11
Tunnels in Aufhausen korrigiert
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
Version #10
Mechanical edit: remove tag priority from railways
- Edited by drolbr_mdv
- Changeset #38747029
Tags
axle_load | 22.5 |
---|---|
bridge | yes |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
Version #9
Streckennummern und -Daten im nordöstlichen RB Südwest
Tags
axle_load | 22.5 |
---|---|
bridge | yes |
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
meter_load | 8.0 |
name | Riesbahn |
operator | DB Netz AG |
priority | primary |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4710 |
ref:La | 16 |
start_date | 1863 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
Version #8
Priority-Tag gesetzt
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
name | Riesbahn |
operator | DB Netz |
priority | primary |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 4710 |
start_date | 1863 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #7
normalized operators
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
name | Riesbahn |
operator | DB Netz |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 4710 |
start_date | 1863 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #6
Bahnanlagen-Details zwischen Aalen und Donauwörth
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
name | Riesbahn |
operator | DB Netz AG |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 4710 |
start_date | 1863 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #5
Riesbahn württ. Teil
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | Riesbahn |
operator | DB Netz AG |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 4710 |
start_date | 1863 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #4
route=railway Riesbahn (bestand schon) vervollständigt von Nördlingen bis Aalen. Elektrifizierungs-Details.
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
name | Riesbahn |
railway | rail |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
Version #3
(wlk) railway tagging refinements
- Edited by vwistuttgart
- Changeset #8826764
Tags
bridge | yes |
---|---|
electrified | contact_line |
layer | 1 |
name | Riesbahn |
railway | rail |
tracks | 1 |
Nodes
Version #2
(br) railway tagging refinements
- Edited by vwistuttgart
- Changeset #8722084
Tags
bridge | yes |
---|---|
electrified | contact_line |
layer | 1 |
railway | rail |
tracks | 1 |
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |