Loading...
Way: ST1: Alba Iulia sud Interchange (253677237)
Version #36
Update A10 lot 1 progress based on CNAIR reports
- Edited by rpristopan
- Changeset #92429144
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 1 |
name | ST1: Alba Iulia sud Interchange |
oneway | yes |
opening_date | 2021 |
smoothness | excellent |
status | AC,builder:Pizzarotti,progress:92.50%13.10.2020 91.0%/01.09.2020 88.50%/01.06.2020 84.60%/01.04.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
Nodes
5 nodes
- 2 (2595757733) (part of ways A10 (523473772) and A10 (824708854))
- 2595757730
- 6374487896
- 6374487581
- 2595757723 (part of ways 253677236 and 255039976)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |