Loading...
Way: 245324560
Version #59
Preparing to add turn lanes.
Tags
destination | Borș;Cluj-Napoca;Turda;Câmpia Turzii |
---|---|
destination:ref | A10 |
highway | motorway_link |
lanes | 2 |
maxspeed | 80 |
oneway | yes |
smoothness | excellent |
start_date | 2021 |
status | AC,builder:Pizzarotti,progress:99.50%/01.06.2022 98%/22.09.2021 93%/01.12.2020 82.00%/13.12.2019 60%/31.12.2018 39.50%/30.11.2017 16.2%/31.12.2016 12.55%/30.06.2016 |
surface | asphalt |
surface_survey | 2021JUL_RobertH@peundemerg.ro |
Part of
2 relations
- Relation A10 - Lot 1 (Sebes-AlbaIulia) (9331329)
- Relation A10 - Sebes interchange (7391249)
Nodes
14 nodes
- 2274240976 (part of ways A1 (218146557) and A1 (1136908380))
- 6865726884
- 8772568982
- 3491003850
- 6865759185
- 3491003851
- 3491003852
- 3491003853
- 2525415467
- 3491003849
- 8772568981
- 5381390624
- 10598261383
- 2876858323 (part of way 342056180)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |