Loading...
Way: 244806193
Version #10
S4+IR13 split at section Altstaetten <-> Buchs, due to track closure at least until October 2023 (from 27 Feb '23), new bus lines EV1+EV2 mapped, still missing EV3. Furthermore, temporary IR13 Chur - Buchs SG created.
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 140 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 1 |
railway:preferred_direction | backward |
railway:radio | gsm-r |
railway:track_ref | 83 |
usage | main |
voltage | 15000 |
Part of
8 relations
- Relation IC 3: Chur - Basel (6651696)
- Relation S12: Chur → Sargans (10961964)
- Relation S12: Chur → Sargans (10961965)
- Relation 721 (3300318)
- Relation 900 (2847638)
- Relation IR 35 (13131233)
- Relation 880 (3263775)
- Relation IR 13 (14726480)
Nodes
3 nodes
- 2523053613 (part of ways 1153627431 and 229048562)
- 9177840719
- 2520782564 (part of way 244807626)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |