Loading...
Way History: 222374707
Version #6
rail centering
- Edited by Marc Mongenet
- Changeset #142664016
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 120 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
16 nodes
- 2313466252 (part of ways 544381272 and 109507352)
- 2427814999
- 2313466251
- 11266761578
- 10220580498
- 11266761579
- 11266761580
- 10220580495
- 11266761581
- 2313466250
- 10220580494
- P937 (10220580491)
- 10220580489
- 2313466249
- 11266761583
- 2313466248 (part of ways 1190177161 and 222374706)
Version #5
add Signals Neuhausen, Lottstetten
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 120 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
11 nodes
- 2313466252 (part of ways 544381272 and 109507352)
- 2427814999
- 2313466251
- 10220580498
- 10220580495
- 2313466250
- 10220580494
- P937 (10220580491)
- 10220580489
- 2313466249
- 2313466248 (part of ways 1190177161 and 222374706)
Version #4
ETCS Schaffhausen - Bühlach
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 105 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
6 nodes
- 2313466248 (part of ways 1190177161 and 222374706)
- 2313466249
- 2313466250
- 2313466251
- 2427814999
- 2313466252 (part of ways 544381272 and 109507352)
Version #3
Passenger Lines
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 105 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
6 nodes
- 2313466248 (part of ways 1190177161 and 222374706)
- 2313466249
- 2313466250
- 2313466251
- 2427814999
- 2313466252 (part of ways 544381272 and 109507352)
Version #2
railway details Neuhausen
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 105 |
operator | SBB |
railway | rail |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
6 nodes
- 2313466248 (part of ways 1190177161 and 222374706)
- 2313466249
- 2313466250
- 2313466251
- 2427814999
- 2313466252 (part of ways 544381272 and 109507352)
Version #1
Neue Doppelspur SBB Altenburg - Fischerhölzlitunnel
- Edited by seppwabala
- Changeset #16214684
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
railway | rail |
tracks | 1 |
voltage | 15000 |
Nodes
5 nodes
- 2313466248 (part of ways 1190177161 and 222374706)
- 2313466249
- 2313466250
- 2313466251
- 2313466252 (part of ways 544381272 and 109507352)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |