Loading...
Way: 211108522
Version #14
Tidal Basin Roundabout construction area updates. Route through to Scarab Close can probably be included in construction area too.
Tags
access | no |
---|---|
construction | unclassified |
cycleway:left | separate |
cycleway:left:oneway | no |
highway | construction |
lit | yes |
maxspeed | 20 mph |
oneway | yes |
proposed:highway | trunk |
proposed:junction | circular |
sidewalk | left |
surface | asphalt |
Nodes
7 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |