Loading...
Way: 190334050
Version #2
GasWorx Construction; https://www.tampa.gov/road-closure/temporary-road-closures-channelside-dr-e-4th-ave-e-3rd-ave-e-2nd-ave-n-avenida
Tags
HFCS | Urban Collector |
---|---|
check_date | 2024-05-11 |
construction | secondary |
highway | construction |
junction | roundabout |
lanes | 1 |
note | construction details: https://www.tampa.gov/road-closure/temporary-road-closures-channelside-dr-e-4th-ave-e-3rd-ave-e-2nd-ave-n-avenida |
oneway | yes |
opening_date | 2025-05-30 |
Part of
2 relations
- Relation HART route 9 (1138319) (as forward)
- Relation HART route 8 (1138320) (as forward)
Nodes
2 nodes
- 259743521 (part of ways East 4th Avenue (23959011) and 190334101)
- 259743522 (part of ways Channelside Drive (23959040) and 115040545)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |