Way History: Ligne d'Arras à Saint-Pol-sur-Ternoise (154831600)
Version #28
nettoyage tag inutile (Pas-de-Calais) #detail
- Edited by Denis_Helfer
- Changeset #131362888
Tags
check_date | 2021-01-24 |
---|---|
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
37 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 10178015290
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #27
appariement ref ligne 307000 (Aubigny-en-Artois) #OSM_vs_GAIA
- Edited by Denis_Helfer
- Changeset #128809301
Tags
check_date | 2021-01-24 |
---|---|
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
37 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 10178015290
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #26
Osmose, Ortho HR; BD Carthage, cadastre, Volta
- Edited by Max-Kritic
- Changeset #126478741
Tags
check_date | 2021-01-24 |
---|---|
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
36 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #25
Ouverturede la ligne le 12/09/2022
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
36 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #24
Ouverturede la ligne le 12/09/2022
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | main |
Nodes
36 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #23
Ouverturede la ligne le 12/09/2022
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
36 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #22
Petite correction.
- Edited by viollet_le_ducq
- Changeset #115815439
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | construction |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
36 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 9395537957
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #21
Travaux sur la ligne d’Arras à Saint-Pol-sur-Ternoise.
- Edited by viollet_le_ducq
- Changeset #115815394
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | construction |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
35 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9395565994
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #20
corrections/ajustements ligne 307000 (St-Pol / Ternoise)
- Edited by Denis_Helfer
- Changeset #109856662
Tags
check_date | 2021-01-24 |
---|---|
detail | track |
disused:railway | rail |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | disused |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
34 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 9016293079
- 3324173930
- 9016293078
- 940596614
- 3324182070
- 3324182074
- 9016293077
- 9016293075
- 9016293076
- 940596837
- 9016293074
- 9016293073
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 9016293070
- 9016293071
- 9016293072
- 9016293069
- 940596783
- 9016293068
- 9016293067
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #19
corrections/ajustements ligne 307000 (St-Pol / Ternoise)
- Edited by Denis_Helfer
- Changeset #109832234
Tags
check_date | 2021-01-24 |
---|---|
detail | track |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:track_ref | U |
ref | 307000 |
ref:FR:SNCF_Reseau | 307000,1,UNIQUE,192.195,229.263 |
source | BDOrtho IGN |
usage | branch |
Nodes
21 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 9015339382
- 1654128836
- 9015339385
- 1654128842
- 9015339386
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #18
corrections/ajustements ligne 307000 (Maroeuil)
- Edited by Denis_Helfer
- Changeset #109825007
Tags
check_date | 2021-01-24 |
---|---|
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
ref:FR:SNCF_Reseau | 307000 |
source | https://www.lavoixdunord.fr/919062/article/2021-01-11/plus-aucun-train-ne-circulera-entre-arras-et-saint-pol-jusqu-au-printemps-2022 |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #17
Complément informations sur la Ligne d'Arras à Saint-Pol-sur-Ternoise
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
construction:railway | yes |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | construction |
ref:FR:SNCF_Reseau | 307000 |
source | https://www.lavoixdunord.fr/919062/article/2021-01-11/plus-aucun-train-ne-circulera-entre-arras-et-saint-pol-jusqu-au-printemps-2022 |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #16
Osmose, Ortho HR; BD Carthage
- Edited by Max-Kritic
- Changeset #98413317
Tags
check_date | 2021-01-24 |
---|---|
construction | rail |
construction:railway | yes |
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | 2022-03-21 |
operator | S.N.C.F. |
passenger_lines | 1 |
railway | construction |
source | https://www.lavoixdunord.fr/919062/article/2021-01-11/plus-aucun-train-ne-circulera-entre-arras-et-saint-pol-jusqu-au-printemps-2022 |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #15
Fermeture pour travaux de la ligne d’Arras à Saint-Pol-sur-Ternoise.
- Edited by viollet_le_ducq
- Changeset #98076194
Tags
check_date | 2021-01-24 |
---|---|
electrified | no |
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
opening_date | Printemps 2022 |
operator | S.N.C.F. |
passenger_lines | 1 |
railway | construction |
source | https://www.lavoixdunord.fr/919062/article/2021-01-11/plus-aucun-train-ne-circulera-entre-arras-et-saint-pol-jusqu-au-printemps-2022 |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #14
Ligne d’Arras à Saint-Pol-sur-Ternoise
- Edited by viollet_le_ducq
- Changeset #97323607
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
operator | S.N.C.F. |
passenger_lines | 1 |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #13
Ligne de saint-Pol-sur-Ternoise à Étaples
- Edited by viollet_le_ducq
- Changeset #82305565
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
maxspeed | 110 |
name | Ligne d'Arras à Saint-Pol-sur-Ternoise |
passenger_lines | 1 |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #12
Adding railway maxspeed values in the north of Hauts-de-France
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
maxspeed | 110 |
passenger_lines | 1 |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
18 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
Version #11
passenger-lines
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
passenger_lines | 1 |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
25 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
-
4521845335 - 4521845336 (part of way Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 3933432112 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #10
Survey, Osmose, Cadastre, BD Otho IGN, JOSM
- Edited by Max-Kritic
- Changeset #43952691
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
25 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 4521845330
- 4521845331
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
-
4521845335 - 4521845336 (part of way Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 3933432112 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #9
Ligne de Saint-Pol-sur-Ternoise à Etaples
- Edited by Denis_Helfer
- Changeset #36439517
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
21 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 3933432112 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #8
Set importance=regional for TER Nord Pas de Calais
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
railway | rail |
source | CNES/Spot Image |
usage | branch |
Nodes
20 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #7
Quelques ajustements autour de la gare de Saint-Pol-sur-Ternoise.
Tags
Nodes
20 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
- 115 (1625392625) (part of way Rue Wathieumetz (101165755))
- 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #6
Sources : Cadastre, Bing, Bano, Osmose, survey
- Edited by Max-Kritic
- Changeset #28533731
Tags
Nodes
23 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 3324182070
- 3324182074
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
-
1673015803 - 115 (1625392625) (part of way Rue Wathieumetz (101165755))
-
1673015770 -
940596683 - 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #5
Sources : Cadastre, Bing, Bano, Osmose, survey
- Edited by Max-Kritic
- Changeset #28533629
Tags
Nodes
21 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 3324173930
- 940596614
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
-
1673015803 - 115 (1625392625) (part of way Rue Wathieumetz (101165755))
-
1673015770 -
940596683 - 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #4
Usage = Main
Tags
Nodes
20 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 940596614
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
-
1673015803 - 115 (1625392625) (part of way Rue Wathieumetz (101165755))
-
1673015770 -
940596683 - 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #3
railway
- Edited by Maarten Deen
- Changeset #23406909
Tags
electrified | no |
---|---|
gauge | 1435 |
railway | rail |
source | CNES/Spot Image |
Nodes
20 nodes
- 940596708 (part of way Ligne d'Arras à Saint-Pol-sur-Ternoise (101165781))
- 940596614
- 940596837
- 1673015780
- 114 (1167983673) (part of way Rue Faidherbe (248823054))
- 1673015779
- 940596737
- 940596783
-
1673015803 - 115 (1625392625) (part of way Rue Wathieumetz (101165755))
-
1673015770 -
940596683 - 1654128813
- 1654128836
- 1654128842
- 940596579 (part of ways Ligne de Fives à Abbeville (80787335) and Ligne de Fives à Abbeville (974235790))
- 940596570 (part of ways Ligne de Fives à Abbeville (974235789), Ligne de Fives à Abbeville (974235790), and Ligne de Fives à Abbeville (689166243))
- 1654128877 (part of way Ligne de Fives à Abbeville (689166243))
- 1654128878 (part of way Ligne de Fives à Abbeville (689166243))
- 913842744 (part of way Ligne de Fives à Abbeville (689166243))
Version #2
Correction erreur Tag layer absent si Tag bridge existe
Tags
electrified | no |
---|---|
gauge | 1435 |
railway | rail |
source | CNES/Spot Image |
Nodes
9 nodes
Version #1
rajout circuits touristiques
- Edited by olcomm_ild_inr
- Changeset #10963569
Tags
electrified | no |
---|---|
gauge | 1435 |
railway | rail |
source | CNES/Spot Image |
Nodes
4 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |