Loading...
Way: 136240265
Version #4
Bahnanlagen-Details zwischen Nürnberg und Roth
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 40 |
note | Wird bei RE-Einfahrten aus Treuchtlingen nach Gleis 12 mit 40 km/h befahren (nachgemessen per GPS) |
railway | rail |
railway:etcs | no |
railway:lzb | no |
railway:pzb | yes |
service | crossover |
voltage | 15000 |
Nodes
2 nodes
- 249 (1494809518) (part of way 5320 (219571206))
- 257 (1494809521) (part of ways 5320 (345397711) and Treuchtlingen–Nürnberg (244766157))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |