Loading...
Way: Northeast Corridor (127843342)
Version #4
Corrected location of beginning of Amtrak 25Hz at GATE Interlocking (Bowery Bay phase break)
- Edited by IsStatenIsland
- Changeset #98435379
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 25 |
layer | 1 |
name | Northeast Corridor |
old_railway_operator | New York Connecting Railroad |
operator | Amtrak |
owner | Amtrak |
railway | rail |
tiger:cfcc | B11 |
tiger:county | Queens, NY |
tiger:name_base | Amtrak Railroad |
usage | main |
voltage | 12500 |
Nodes
3 nodes
- 1414020908 (part of way Northeast Corridor (127843343))
- 1414020906
- 1414020905 (part of way Northeast Corridor (127843345))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |