Loading...
Way: Orange Ln (1219113267)
Version #2
Apart from frontage rds relocations; the I41 proportion of the South Bridge Project aren't due to be built until 2026 at the earliest. Converting all to proposed
- Edited by KDTW Flyer
- Changeset #150358655
Tags
Nodes
9 nodes
- 11296572705 (part of way Orange Ln (1219113282))
- 11296569143
- 11296569168 (part of way Mid Valley Drive (1219113272))
- 11296569144 (part of way 245634402)
- 11296569145
- 230583234 (part of way 245634402)
- 11296569158
- 11296569156 (part of ways 1219113273 and 1219113271)
- 11296572706 (part of way Orange Ln (1219113284))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |