Loading...
Way: 112550203
Version #14
fixed high speed line limit, corrected SCMT/ETCS L2 border
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1435 |
layer | 1 |
maxspeed | 105 |
maxspeed:tilting | 120 |
operator | RFI |
passenger_lines | 4 |
railway | rail |
railway:scmt | yes |
usage | main |
voltage | 3000 |
Part of
6 relations
- Relation Frecciarossa (Napoli Centrale → Torino Porta Nuova) (2179318)
- Relation Torino-Milano (Alta Velocità) (2596061)
- Relation EC: Milano Centrale => Basel SBB (12225715)
- Relation Train RE4: Milano Centrale => Domodossola (14433201)
- Relation EC: Milano Centrale => Genève (12246201)
- Relation EC 52: Milano => Frankfurt (8392116)
Nodes
2 nodes
- 1278935383 (part of way 172892541)
- 1837349484 (part of way 396528086)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |