Loading...
Way: 200 (1091903839)
Version #17
update progress
- Edited by RobertH-PUM
- Changeset #146954261
Tags
construction:railway:etcs | 2 |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
maxspeed | 35 |
name | 200 |
passenger_lines | 3 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:Aktor / Alstom,progress:24.58%/31.01.2024 24.15%/21.12.2023 19.28%/01.12.2022 11.6%/31.12.2021 |
usage | main |
voltage | 25000 |
Part of
5 relations
- Relation Trasee vechi Brasov - Apata (9416581)
- Relation Reabilitare lot 1 Brasov - Apata (9416122)
- Relation EN 347: Wien - Bucuresti (8739058)
- Relation Linia 205 Brașov - Podu Olt (16691387)
- Relation Secția 200 Brașov - Curtici (3430966)
Nodes
2 nodes
- Brașov (5931373043) (part of way 200 (895876222))
- 1936858980 (part of ways 263201837 and 300 (895622994))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |