Loading...
Way History: Industrial Parkway (1079880869)
Version #4
Cleanup tags for new segment of Alabama State Route 158 opening.
- Edited by OrdinaryScarlett
- Changeset #149035988
Tags
bicycle | yes |
---|---|
check_date | 2024-03-22 |
expressway | yes |
foot | yes |
fut_ref | US 98 |
hgv | designated |
highway | trunk |
lanes | 2 |
maxspeed | 65 mph |
name | Industrial Parkway |
oneway | yes |
ref | AL 158 |
smoothness | excellent |
start_date | 2023-10-17 |
surface | asphalt |
Nodes
13 nodes
Version #2
Updates to SR 158/Future US 98 in Alabama. Mostly alignments to imagery based on completed construction on Esri imagery.
- Edited by MoiraPrime
- Changeset #138821234
Tags
construction | trunk |
---|---|
fut_ref | US 98 |
hgv | designated |
highway | construction |
lanes | 2 |
surface | asphalt |
Nodes
12 nodes
Version #1
Road realignment near SR 158
- Edited by MoiraPrime
- Changeset #123826565
Tags
construction | trunk |
---|---|
fut_ref | US 98 |
hgv | designated |
highway | construction |
lanes | 2 |
surface | asphalt |
Nodes
5 nodes
- 1240226925 (part of way Industrial Parkway (1079880870))
- 1240227834
- 1240227035
- 1240227199
- 1240227530 (part of way Industrial Parkway (979896467))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |