smithkm's Notes
Notes submitted or commented on by smithkm
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5095573 | smithkm | This segment between the connection to the parking aisle and the intersection with the highway is not built to cycleway standard, it's just a sidewalk made of concrete slabs that has a single sign in one direction designating it as shared. I think highway=footway + bicycle=designated would better represent this than highway=cycleway. The rest, from the connector to the parking lot up to Ravine Way is built as a unsegregated cycleway (wide and smooth asphault). |
|||
| 4968207 | There is a new e-bike rental station here |
||||
| 4663538 | InfiNorth | OpenStreetMap Wiki shows that this should be just part of Harbour Road rather than mapped separately, and tagged as followed: cycleway:left=track
This seems to be a consistent problem throughout the entire CRD. |
|||
| 4297907 | smithkm | https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf shows viewmont and Mapleton as shared bikeways. |
|||
| 5098063 | smithkm | Significant changes to geometry here. Need to survey some GPS traces of the bike paths and sidewalks. |
|||
| 5065691 | smithkm | Seaton street here is marked as a cycle route, and the pedestrian underpass as a designated bike path. I don't remember and signs designating any of this for bicycles. Need to ground truth. The underpass is clearly designed for pedestrians only. It may be technically allowed for bikes in the basis of not technically being a sidewalk. |
|||
| 4288149 | smithkm | Reserved under building parking, for drivewise driving school. Max height 6'6" via StreetComplete 58.0 Attached photo(s):
|
|||
| 4288155 | smithkm | Exit from underground parking via StreetComplete 58.0 Attached photo(s):
|
|||
| 4968206 | There is a new e-bike rental station here. |
||||
| 5095507 | smithkm | sweet factory is now Migration, gift shop? jewlery? |